NOTICE OF TRAFFIC REDIRECTION DURING LE TOUR DE LANGKAWI


NOTICE OF TRAFFIC REDIRECTION DURING LE TOUR DE LANGKAWI

 

Date: 9th April 2019

 

Dear Customers,

 

Kindly be informed that Resorts World Genting will be hosting the Genting Stage (Stage 4) of the 24th Annual Le tour de Langkawi bicycle race on 9th April 2019.

 

Please take note of the below:

 
  • 2.00 pm to 5.00 pm: Closure of the downhill road from the Mushroom Farm (hilltop) to the Gohtong Jaya roundabout after checkpoint.
  • 2.00pm to 4.00pm: Closure of road from Batangkali Security Check Point  to the Gohtong Jaya roundabout.
  • The downhill road from Awana SkyCentral/Genting Highlands Premium Outlets to Gohtong Jaya roundabout will be closed between 2.00 pm and 5.00 pm.  The uphill road between these 02 locations will be converted into two-way traffic.
  • The Genting SkyWay will be open to cater for customers travelling up to the Resort. Operations will commence from 7.00am to 12.00am.
  • The Awana Skyway is open as normal from 7.00am to 12.00am.
  • Customers who wish to book the resort’s limousines to travel down to their respective destinations, are advised to take the skyway and pickup is either from  the Awana SkyCentral Station or the Lower Genting Skyway Station.
 

Please note that the timings of road closure are subject to change. The roads will be re-opened to the public as soon as possible upon the completion of the event. We apologise for any inconvenience caused.

    

Yours sincerely,

RESORTS WORLD GENTING

Facebook comments:

FIND OUT MORE :


MUST-SEE PICTURES/VIDEOS

FOLLOW US